Akzo Nobel

Project: Air-tight facade sealant for Akzo Nobel Head Office Amsterdam
Description of the project:
The project, under subcontract of Dura Vermeer, concerned to air-tight seal the joints and gaps in the facade and the connections between the flooring and the facade. Liquid Rubber and the JointFiller were applied around the facade panels and the connection between floor-facade. These products are perfect to ensure an air-tight sealant.

Afterwards, the Kingspan insulation panels were placed and the rest of the facade was finished. The quick and easy application of Liquid Rubber ensured that this project of 6.250m1, was airtight sealed really quickly

Toggle Content goes here